Marine Insurance

Builder's Risk Insurance

Shipbuilding is a major investment at every stage. From keel laying to sea trial, every phase of your vessel's construction in Batam is protected with Builder's Risk Insurance.

Coverage Period

Protection at Every Stage of Construction

01

Keel Laying

Coverage begins at keel laying — the foundational stage of vessel construction.

02

Construction Phase

All stages of framing, hull plating, deck installation, and systems fit-out are covered.

03

Launching

Coverage includes the moment the vessel first enters the water, including capsize and hull damage risks.

04

Sea Trial & Handover

Extended protection through sea trials until formal delivery of the vessel to its owner.

Builder's Risk Coverage

Risks Covered During Vessel Construction

Physical damage during construction
Fire and explosion at the shipyard
Flooding and extreme weather
Design and construction defects
Damage during sea trials
Third Party Liability (TPL) for shipyard
Worker negligence damage
Dismantling and repair costs
Increased Value coverage
Launching risks
Real Case Study

Hands-On Experience Handling Builder's Risk Claims in Batam

Not just theory — this is how a Builder's Risk claim was actually handled, first-hand, at a shipyard in Tanjung Uncang, Batam.

Rio handling a Builder's Risk Insurance claim at a shipyard in Batam

Documenting and handling a Builder's Risk claim on site at a shipyard in Batam.

On a vessel construction project under way at a Tanjung Uncang shipyard, a technical incident during the construction stage damaged part of the vessel's structure. As the practitioner supporting the insurance process, the first step was to make sure the damage — photos, video, and a timeline of events — was documented as quickly as possible before repairs began. This initial documentation is crucial because the insurer's surveyor needs evidence of the real condition on site to assess the claim against the applicable policy.

Rio with the vessel owner and the insurer in front of a vessel under construction at the Tanjung Uncang shipyard, Batam

Coordinating directly with the vessel owner and the insurer at the Tanjung Uncang shipyard, Batam.

Once the initial documentation was complete, the shipyard, the vessel owner, and the insurance team coordinated to align the timeline of events and the estimated loss value. This technical discussion took place on the project site so that everyone shared the same understanding of the vessel's condition and the scope of the policy. In the end, the claim was processed and approved because the Builder's Risk policy in use covered construction risks from the earliest stage of the build — so the loss from the technical incident was covered under the policy terms.

A vessel under construction at a shipyard in Batam, illustrating a project that needs Builder's Risk Insurance

The construction stage — the most critical period, needing Builder's Risk protection from day one.

Practitioner Insight

This case shows how important it is to define the scope of cover precisely from the start of a project — not just to meet the contract's administrative requirements. A cheap premium is not always the best choice; coverage gaps that go undetected early are often the reason claims are partly or fully rejected.

Practical Steps

How to Arrange Builder's Risk Insurance Properly

Four steps I recommend, based on experience supporting a range of shipbuilding projects at Batam shipyards.

01

Consultation & Initial Risk Assessment

Share the project specifications — vessel type, total contract value, construction duration, and the yard's working methods — so coverage needs can be mapped accurately from the start.

02

Setting the Sum Insured & Scope of Cover

The sum insured is based on the total contract value, not a rough estimate. The scope of cover is also adjusted depending on whether it includes sea trial and Increased Value.

03

Technical Survey & Policy Issuance

The underwriter or surveyor assesses the yard and construction methods before issuing the policy — ideally completed before keel laying begins so there is no gap in protection.

04

Monitoring While the Project Runs

Report scope changes, duration extensions, or added sea trials to the insurer so the policy stays relevant until the vessel is delivered.

FAQ

Builder's Risk Insurance – Common Questions

Builder's Risk Insurance (also known as Marine Builder's Risk or DSU – Delay in Start-Up) protects a vessel during construction at the shipyard. Coverage begins at keel laying and extends through sea trials and formal handover to the owner.

Ready to apply? Fill in a short form and we'll do the initial assessment.